Lynn should be writing this because she is so excited about running water. The plumbing is finished and the lines were tested today. We are good to go. The water is flowing...well, to nowhere, but it's flowing with NO LEAKS!
A few pics to show where we are with about 5 weeks left to go...
This is our new light for our little "study corner" in the kitchen. This is the study corner as it looks now...
Tala gets her groove on with Sophie's shuffle.
We have water and it is flowing (to nowhere...at the moment)! We have beautiful pipes for the dishawasher and ice-maker...
This is a view from the dining room into the kitchen!
We have fabulous pipes and wires everywhere...
This is our shower...
The concrete guy finally finished after almost a year after being paid!
We have an awesome walkway all the way to the backyard!
Sink...beautiful and we love it. It came with a personal note from the craftsman that made it. Cool. Our range. It is very pretty. I will mess it up with lots of cooking...one month soon!
Sophie’s bathroom floor from Floor De Lis in Mid-City. Hate the name, but they are very nice people. The girl that sold it to us went to St. Antny (Anthony) with me. Small world.
Stacy says that we will need the floor soon…I can’t wait!
As of today, Jan 1, 2009, we are HALF way through our renovation journey. There's been a lull in the activity due to the holidays, but January will be an exciting month!
We are looking forward to a 2009 filled with progress and prosperity---no pains in the knee or the a**!
Included are some pics of Soph with Tala and a Lucy update! She is 4 1/2 months and sooooo adorable!